Nucleares

Nucleares 1.2.20

Version
1.2.20
Version Date
July 10, 2024
Links

Patch Notes

Patch notes: V 1.2.20.160

The following improvements and fixes were implemented:

  • Added a master switch in the control room for the resistance banks.
  • Testing area updated.
  • Fixed the bug with the synchronoscope decalibration after a blackout (when more than one generator turbine is installed).
  • Corrections were made to some units of measurement:
  • 1 - On the tablet, under "Service Compliance", the "Generated Energy", "Peak Generated" and "Total Demand". 2 - On the tablet, under "Service Compliance", when on the "Efficiency" graph, the "POWER (MW)" value on the graph. 3 - The gauge that is labelled "Supplying Externally" over the internal supply console in the control room. 4 - The two screens that show "Accumulated Energy" and "Energy in External Network" bar graphs. 5 - The "Generated" figure on the screen in the middle of the consoles

This update is compatible with all previous savegames. If you're having trouble loading a saved progress, please let me know!

We are waiting for you in the game's Discord!